construction of schools

Title : construction of schools

Client : construction of schools

Consultant : Technical Bureau

  • Location : Karaj
  • Usage : School
  • Start Time : 1980
  • End Time : 1983
  • Area (m^2) : Totally 10000 square meter
  • Infrastructure (m^2) : 5000

To provide required educational spaces in karaj, 5 schools were constructed in Dinar Abad, Jafar Abad, Hafezieh, North Hafezieh and Yadollah Aghili districts of karaj, through 5 separate contracts. The operations included all constructional, installation and landscaping of the schools. The building has steel structure with brick ceiling and walls. Also the façade is cement.

;