Cartons Kar Factory Development Projec

Title : Cartons Kar Factory Development Projec

Client : Cartons Kar Factory

Consultant : Technical Bureau

  • Location : Ghom
  • Usage : Development Project
  • Start Time : 1984
  • End Time : 1987
  • Area (m^2) : Totally 5000 square meter
  • Infrastructure (m^2) : 3000

Executive operations of the development project of carton kar factory were fulfilled in a plot of land measuring 6000 square meter. This projects included the constructional of restaurant and hotel, measuring about 2400 square meter and the saloon of central engine room measuring about 600 square meter. The structures of the buildings are steel and the facades have been executed with terracotta bricks.

;