The projects consists of these buildings:
- The 500 people building: 2-storey with total area of 10600 m2,concrete structure, brick walls and the exterior, a combination of travertine stone with red and yellow brick
- Clinic building: Total area of 1000 m2, 1-storey,concrete skeleton, brick walls and the exterior, a combination of travertine stones with red and yellow bricks
- Entrance building: Total area of 1250 m2, 4-storey, concrete structure, brick walls and the exterior of travertine stone, bricks and tiles
- Administrative building: Total area of 1867 m2, 3-storey, concrete structure, brick walls and the exterior of travertine stone, bricks
- Visitors building: Floor area of 4163 m2, 1-storey,concrete structure, brick walls and the exterior of travertine stone, bricks
- Waste Water treatment: Total area of 4400 m2 and concrete structure
- The 2000 people building: One and a half storey with total area of 24500 m2,concrete structure, brick walls and the exterior of travertine stone red and yellow brick
- 12 watchtowers
- Landscaping 18000 m2, also reinforced concrete pavements and pedestrian routs.
The HVAC systems consists of air washer and package unit. The heating system consists of aluminum radiator, fan coils and unit heater and the cooling system consists of evaporative coolers and air washers.
All buildings have also these systems: fire alarm and extinguish part, central telephone system, CCTV, central paging system and computer network part, Electric power substation, security system, lighting and guards summoning system