Noor Eye clinic Project is started.

After the evaluation of contractors who participated in the limited tender which was held by Noor Eye hospital tool place, Civil Engineering 142.Inc was chosen as the contractor for the project of relocating existing facilities and constructing Noor Eye Clinic 

This project involves demolition, excavation, drainage, geomembrane, construction of guardian structure, foundation, retaining wall, steel structure and concrete roof of this 15-floor building.

The project was started in January 2021 and the operations of demolition and excavation are currently underway.

;